Hero video/fallback image depicts a construction zone - several buildings in construction with large cranes in the sky working on them. On the ground below there are cement trucks and supplies.
FROM VISION
TO REALITY
NYC Health + Hospitals, Elmhurst
QBG completed an 18-week interior fit-out of a new 40,000-square-foot office space for NYC Health + Hospitals, Elmhurst, creating a centralized workplace for the organization’s Finance, Patient Accounts, Grants, and Human Resources departments.
The project included a new reception area, a mix of open cubicles and private offices, conference rooms, a dining area, and restrooms, all supported by newly installed MEP systems designed to accommodate the updated layout and operational needs.
Montefiore Nyack
QBG is managing a GMP contract for the procurement, installation, and commissioning of a new 2800 kW generator, a critical upgrade that will fortify the hospital’s emergency power infrastructure. The project delivers a significant enhancement to the facility’s resilience and operational readiness.
Beyond the generator itself, the work includes comprehensive improvements to associated electrical, mechanical, and site systems, ensuring that the hospital’s backup power capabilities meet the highest standards of reliability and performance.
NYU Langone
QBG completed a 14-week complete renovation and fit-out of a 4,700 square foot office space in NYU Langone.
The project included reconfiguration of mechanical, electrical, and lighting systems, as well as new millwork throughout, a pantry, bathrooms, and office spaces, modernizing the facility and enhancing functionality.
Carmel Richmond Nursing Home
QBG executed the rigging and placement of three new 6,500 pound Columbia boilers on newly pored pads in Staten Island, NY over a four-month schedule.
The project improved the safety and functionality of the space: it included ceiling patching and painting, comprehensive firestopping of the mechanical room, installation of new lighting, and application of an epoxy floor finish.
Mount Sinai Hospital
QBG completed the replacement of three existing rooftop AHUs with two new units at the Queens branch of Mount Sinai hospitals.
The project was carefully phased to maintain continuous air conditioning through construction. Isolation booths were used to prevent dust and debris from entering patients rooms, and new steel dunnage was installed by rigging steel from both adjacent streets, ensuring safety and efficiency throughout the upgrade.
Brooklyn Methodist Hospital
QBG completed the replacement of existing chillers in the Brooklyn Methodist Hospital.
The project required removal of existing equipment and comprehensive logistical planning to coordinate work in confined spaces, implement roof protection measures, and manage neighbor communication.
The scope also included DOT coordination for street closures and multiple crane picks, ensuring a safe and efficient installation.
Interfaith Hospital Gift Shop
QBG delivered a renovation of the hospital gift shop in the Interfaith Medical Center in Brooklyn, NY. The scope included custom millwork, a sleek glass storefront, and upgraded lighting to create a modern and inviting retail environment.
Paramount Wellness Center
QBC completed interior and exterior renovations at the Paramount Wellness Center in Haddam, CT.
Interior improvements included patient rooms, common areas, bathrooms, and a kitchen.Exterior improvements featured upgraded landscaping, new sidewalks and asphalt, and the construction of ADA-compliant ramps, stairs, and handrails to optimize accessibility and site usability.