45 Park Avenue
QBG completed a 30-week apartment conversion at 45 Park Avenue in New York City, combining three existing residences into a single 4,000-square-foot home with a fully reimagined layout and elevated finishes throughout.
The project included a new kitchen and great room with a fireplace, along with the construction of four new bedrooms, four new bathrooms, a den/study, and dedicated storage and laundry areas.
East 68th Street
QBG completed the demolition and full renovation of a 1,500-square-foot apartment, delivering a reimagined residence with upgraded mechanical and electrical infrastructure.
The project included a full kitchen build-out and custom finishes throughout, featuring tailored millwork, hand-selected stone, and refined lighting elements.
East 80th Street
QBG executed a full gut renovation of a 7,500-square-foot townhouse, transforming the residence through the installation of a grand new staircase and comprehensive upgrades to all electrical, plumbing, and HVAC systems.
Private Residence
QBG completed the new construction of a private residence in New Canaan, CT.
The home features all-new mechanical, electrical, and HVAC systems, along with extensive custom millwork throughout. Highlights include a circular bathroom, wet bar, garage with elevator to the basement, and a playful slide connecting the main living room to the basement bar. Exterior work incorporated high-end landscape design with an infinity pool, orchard, and wooden walkways in a parklike setting, resulting in a distinctive modern estate.
Confidential Residential Tower
QBG completed the fast-track renovation and modernization of corridors and the lobby at a confidential residential tower in Jersey City, NJ.
The multi-phased project featured new paint and wallpaper throughout the hallways, executed on an accelerated schedule with two floors completed every two weeks to accommodate residents in the occupied building.
The Armory
QBG completed the renovation of 52 occupied residential apartments at the Armory.
The scope included new HVAC systems, roof replacement, storm drain connections, and façade repairs, along with the construction of a new elevator shaft and modernization of laundry facilities, resulting in a fully upgraded residential community.
Nottingham Tower
QBG completed the renovation of over 165 occupied affordable housing units at Nottingham Tower.
The project was executed under a multi-phase master plan designed to coordinate tenant relocations, accelerate construction, and modernization upgrades, resulting in an efficient unit turnover and an improved residential environment.
25 Central Park West
QBG completed the renovation and combination of two apartments into a single residential unit.
The project involved a full reconfiguration of the floor plan, including a new kitchen, bathrooms, and bedrooms. High-end millwork, lighting, and finishes were incorporated throughout, resulting in a seamlessly integrated and sophisticated space.
1000 Park Avenue
QBG completed the demolition and complete gut renovation of a 2,200 square foot apartment on Park Avenue.
The project included the installation of a new staircase, custom finishes such as millwork, stone, and lighting, and a state-of-the-art audio/visual system, resulting in a fully modernized and sophisticated residential space.